..The Canyons Fire Station #36
..Silver Lake Fire Station #34
..Chihuly Art Glass Exhibition
..Eccles Art Center..Alicante
..Charles
H. Culp,
..President
..Michael Vance,
..Vice Pres., Operations Mgr.
..Richard G.Dunn,
..Sec/Treas., Estimator
..Debra Platis,
..Controller
..Kim Arnold,
..Director of Human Resource
..Ross Barrell,
..Estimator
..Angie Johnstun,
..Proj Mgr./Admin./Marketing
..Taylor Maxfield,
..Project Manager
..Jon Easter,
..Vice President, CA
..Mike Job,
..Project Manager, CA
..Deborah Medeiros,
..Project Administrator, CA
..Linda Dorman,
..Project Administrator, CA
..Andrew Feinour,
..Project Manager, CA
..Dan Soriano,
..Project Manager, CA
..Kristian Jackson,
..Project Engineer, CA
![]() |
![]() |
![]() |
|
![]() ![]() |
The Challenger school in Lehi is a 40,000 S.F. new slab on grade building, built into a hillside so that the classrooms and offices can be accessed from both sides. The wood framed structure included aluminum storefront windows that were clad with brick, stucco, and stone veneers. The elevator was installed for a completely accessible building. The large site was carved out of the hillside and is framed by large stone strong retaining walls on three sides. There is a one way road around the property that enables parents to drop of their children on the upper side or lower side of the building in a safe and efficient manner. The school incorporates two fenced in playgrounds with the latest soffal and rubber nugget materials available to insure child safety.
Owner: Challenger Schools | About
Culp | Civic | Institutional
| Residential | Commercial
| © Culp Construction Company, 2002 |
||